Purpose: This project is required for maintenance of the Aldie Wastewater Treatment Plant (WWTP), which was originally constructed in 1996.

Project Description: This project includes various upgrades to the Aldie WWTP and its influent low-pressure force main. These improvements include constructing a permanent bypass connection to the influent low-pressure force main, performing structural repairs to the WWTP, installing a new impressed current cathodic protection system at the site, and repainting the process tank. All work will occur at the WWTP and no service interruptions are expected.