Loudoun Water provides a wealth of information on the public website, with many of the frequently requested links and/or topics provided below:
- Request for Connection Invoice
- Water Meter Request
- Rates, Fees, Charges and Penalties
- Utility Disconnection/Demolition Permit (Demo permit)
- Product Review Committee/Approved Materials
- Hydrant Meter Program (including fire hydrant access/fire hydrant usage questions)
- Hydrant Flow Test Request
- Utility Location
-
Easement Location
- Loudoun Water easements must remain unencumbered
- Recorded easements can be found in the Loudoun County Land Records
- Submit a VA811 excavation ticket for utility marking and to discuss any potential easement issues with the Loudoun Water Utility Protection Team
- Blasting/Equipment Crossings
- Commercial and Industrial Wastewater Program (Pretreatment)
- Reclaimed Water Service Area Map
If you are within Loudoun Water’s service area Service Area Map and need further assistance, please request information through the Predesign Meeting or Engineering Inquiry form linked below.
If you currently have a project submitted to Loudoun Water, please do not submit questions through this webpage/forms and instead contact your assigned Loudoun Water Engineer plan reviewer.
Engineering Inquiry Request Guide - Initial response within 3 days
The topics listed below are the most common request types for the Engineering Inquiry:
- Homeowner/Resident
-
Map of Existing Utilities to a specific site
- Please note: the map will show water, sewer and reclaimed pipe and size of pipe in proximity to the site. Pipe capacity and/or flows are not available.
- As-builts
- New service request for single lot - water and/or sewer only permit
-
VDOT LUP-IPP (Land Use Permit Application – In Place Utility (New Street Acceptance))
- SPECIAL PROVISIONS IN CONNECTION WITH PERMIT
- Project must have passed Loudoun Water Final Inspection
-
Boxed information on the form (lower portion) must be completed by applicant prior to submitting to Loudoun Water
- Subdivision Name is the Loudoun Water project subdivision name
- Plan Approval Date is the date of the Loudoun Water approval letter
- Provide road names and stationing (only roads that are VDOT right-of-way; do not include private roads)
-
Top half of the form to be filled out by Loudoun Water upon receipt with the Inquiry Request
- Loudoun Water will produce a map and sign form
- Loudoun Water will return electronic documents and signed for to applicant via email within a standard review time window of 2 weeks
-
Miscellaneous/Other
- Please use if your request does not fall into the descriptions listed above.
Predesign Meeting Request- Meeting Scheduled no sooner than three (3) days after request is made.
This meeting request is for due diligence/feasibility studies and/or preplan submission discussions, including confidential clients, with questions related to development options such as: process, pipe sizing, questions related to specific site development,etc.