Engineering Design Manual

Engineering Design Manual

Complete Copy

Engineering Design Manual May 2025 cover

 

TABLE OF CONTENTS

 

Appendix C, Easements
Appendix D, Community Systems
Appendix F, Construction Details
General Details: 
G1 - LIST OF FIGURESG11 - RESTRAINT OF VERTICAL OFFSET
G2 - LIST OF FIGURESG12 - CASING INSTALLATION
G3 - LIST OF FIGURESG13 - PAVEMENT PATCH ON PRIVATE PROPERTY
G5A - STANDARD NOTESG15 - IMPERVIOUS TRENCH CHECK
G5B - STANDARD NOTESG16 - MARKER POSTS AND TRACER PEDESTALS
G6 - PIPE BEDDING AND ENCASEMENTG20 - VAULT FEATURES
G7 - CONCRETE THRUST BLOCKG21 - VAULT NOTES
G8 - THRUST BLOCK DIMENSIONSG22 - VAULT LADDER
G9 - LINE ANCHORG23 - HATCH SAFETY FEATURES
G10 - LINE ANCHOR ON LARGE PIPEG24 - ELECTRONICS AT MAGNET METER
 G25 - TRACER WIRE ACCESS BY BOX AT GRADE
 G26 - CONCRETE PIER
 G27 - COATING OF MECHANICAL JOINTS
Cathodic Protection: 
CP1 - BONDING OF PIPE AND FITTINGCP8 - INSULATING FLANGE TEST STATION WITH ANODES
CP2 - THERMITE WELDCP9 - TEST STATION AT STEEL CASING
CP4 - ANODE PLACEMENTCP10 - TEST STATION BY PEDESTAL
CP5 - SPLICE OF ANODE TO HEADER CABLECP11 - TEST STATION BY BOX AT GRADE
CP6 - ANODE BED AND TEST STATIONCP12 - TEST STATION OFFSET FROM PIPELINE
CP7 - INSULATING FLANGE TEST STATIONCP13 - HOT SPOT PROTECTION COATING AND ANODE
 CP14 - HOT SPOT PROTECTION-ANODE PLACEMENT
 CP15 - FLUSHED MOUNTED TEST STATION WITH INSULATING BLANKET
 CP16 - MAGNESIUM ANODE
 CP17 - ISOLATED FLANGE
 CP18 - REFERENCE ELECTRODE
 CP19 - POLYETHYLENE ENCASEMENT
Water: 
W1 - VALVE BOXW22 - SERVICE CONNECTION FOR 3/4" METER-RESIDENTIAL
USE
W2 - TEMPORARY BLOW-OFFW23 - SERVICE CONNECTION FOR 3/4" AND 1" METERS - COMMERCIAL USE
W4 - AIR RELEASEW24 - WATER SERVICE BY JACK AND BORE
W8 - TABLE OF ALLOWABLE LEAKAGEW25 - WATER METER IN SIDEWALK OR SLAB
W9 - HYDRANT NOTESW27 - SERVICE CONNECTION FOR 1 1/2" AND 2" OMNI C2
METERS
W10 - FIRE HYDRANT ALONG STREETW28 - 2" METER NO RISE SETTER OUTDOORS
W11 - FIRE HYDRANT BEHIND DITCHW29 - 3", 4" AND 6" METER IN VAULT
W12 - DEAD END HYDRANTW30 - 2",3", 4" OR 6" METER INDOORS
W13 - HYDRANT BOLLARDSW31 - SERVICE ENTRANCE WITH INDOOR METER
W20 - FIRE SERVICE CONNECTIONW32 - 3/4" OR 1" SUBTRACTION OR INDUSTRIAL PROCESS
METER
W21 - SAMPLING STATION W33 - 1 1/2" OR 2" SUBTRACTION OR INDUSTRIAL. PROCESS
METER
 W34 - INDOOR METER NOTES 
 W35 - PIPE RESTRAINT FOR CUT IN
Reclaimed Water: 
R1 - REUSE VALVE BOXR11 - REUSE SERVICE FOR 2" ULTRASONIC METER
R2 - REUSE AIR RELEASER12 - 2" ACCUMAG REUSE METER
R3 - TERMINUS BY FLUSHING HYDRANTR13 - 3", 4" OR 6" ACCUMAG REUSE METER IN VAULT
R4 - TEMPORARY TERMINUS BY BLOW-OFFR14 - REUSE SERVICE ENTRANCE WITH INDOOR METER
R5 - REUSE FLUSHING HYDRANT BELOW GRADER15 - 3/4" OR 1" REUSE METERS INDOORS
R6 - REUSE FLUSHING HYDRANT ABOVE GRADER16 - 3", 4" OR 6" ACCUMAG REUSE METER INDOORS
R9 - REUSE SAMPLING STATIONR18 - WARNING SIGNS AT REUSE FIXTURES
R10 - REUSE SERVICE FOR 3/4" AND 1" METERSR20 - STANDARD NOTES FOR RECLAIMED WATER
Sewer Gravity: 
S1 - MANHOLES7 - ADVANCE BLASTING
S2 - SIDE VENT FOR MANHOLES10 - LATERAL
S3 - TOP VENT FOR MANHOLES11 - LATERAL WITH VERTICAL BENDS
S4 - OUTSIDE DROP CONNECTIONS12 - SANITARY CLEANOUT
S5 - INSIDE DROP CONNECTIONS13 - WATER METER SETTING-SEWER ONLY ACCOUNTS
 S20 - TABLE OF ALLOWABLE LEAKAGE
 S21 - MANHOLE COVER
 S22 - BLOWDOWN METER VAULT
 S23 - BLOWDOWN METER VAULT NOTES
 S24 - PIGGING STATION
Sanitary Force Main: 
FM1 - FORCE MAIN AIR RELEASE 
Low Pressure Collection: 
LPC1 - GRINDER PUMPLPC5 - FLUSHING CONNECTION
LPC2 - ELECTRICAL SUPPLY TO PUMPLPC6 - LOCATION OF VALVES FOR IN-LINE FLUSHING CONNECTION
LPC3 - LOW PRESSURE LATERALLPC7 - TERMINAL FLUSHING CONNECTION
LPC4 - SERVICE BY TAPLPC8 - AIR RELEASE FOR LOW PRESSURE SEWER
Pretreatment: 
PT1 - INTERCEPTOR/SEPARATOR 

 

 

Appendix G, Materials

Approved Materials List

When the Product Review Committee makes determinations that materials should be added or deleted, or an approval/disapproval/conditional status be revised, the Committee Chair will update the table Approved Materials List. Determinations appear in red text with a revision date within the Approved Materials List. The document will be updated monthly or when revisions are necessary. 